RFX #57764
Water and Sewer
WWTP AUTOMATED DISSOLVED OXYGEN CONTROL SYSTEM
Due Date: Ongoing
The City of Lebanon will be installing a DO control system that will require electrical and instrumentation upgrades to the wastewater treatment plant secondary aeration system.