BID #518
Asphalt and Gravel Specialty Trade Contractors
Salmonberry Ski Hill – Earthwork
Due Date: Ongoing
Grade the slope according to the construction drawings. Channelization of drainage, Site work; Fill, and Cut as required, Concrete work, General Grading, Remove existing top bullwheel, Install extension, and re-install top bullwheel, all required appurtenances, and ensure safe operation. Grade pad for portable restroom facilities, Provide foundation for bottom shed, relocate grounding rods as required to be below grade. Further explanation is available on page 25 under "Special Provisions – SP 02". The hill is very soft. Bidders are encouraged to attend the Pre-Bid Meeting to get a thorough understanding of the terrain and what is expected. A non-mandatory pre-bid meeting will be held on September 6, 2012 at 3:00 pm at the Capital Facilities office located at the airport (address below). Sealed bids will be accepted until 10:00 am local time on September 13, 2012, at the following location inside the Valdez Pioneer Field Airport: City of Valdez Capital Facilities Dept. 300 Airport Road Suite 201 PO Box 307 Valdez, AK 99686 Ph: (907) 835-5478 Fax: (907) 835-5574 The bids will be publicly opened and read at that time. Complete sets of the bid documents may be purchased from Digital Blueprint, 903 West Northern Lights Blvd., Anchorage, AK 99503, (907) 274-4060. Bid documents may also be downloaded from the links below. Bidders are encouraged to download, fill out, and return the Request for Addendum / Plan Holders List form located at the link listed below to ensure receipt of any addendum issued for this project. Bid security in the amount of 5% of the total bid is required. The City reserves the right to waive any irregularities or informalities in a bid and to reject any and all bids without cause. Current minimum prevailing wage rates as published by the Alaska Department of Labor must be paid if required by law. Requirements of the Alaska Employment Preference (AS 36.10) must be met. The City of Valdez "Standard Specifications and Standard Details" shall be used.