RFX #58369
Water and Sewer 

Design Services for the High Zone 2 MG Elevated Water Tank

Due Date: Ongoing

Pre Bid Meeting Date:2018-10-18 00:00:00

The City of Brighton, Colorado by and through its Procurement & Contracts Division is soliciting written sealed proposals from qualified firms to provide Design Services for the High Zone 2 MG Elevated Water Tank. Project Summary: To design for construction a 2.0 million gallon (MG) Hydropillar elevated water tank to be located at Brighton's South Tank Site. The approximate location of the proposed tank has already been determined. In addition to the tank itself, other aspects must also be designed, including the yard piping and an extra pump to be installed in the existing South Tank Site pump house.

Original RFX Post: Go to Post

Contact

Sharon Williams
Phone Number: 303-655-2001
Email Address: [email protected]