BID #12361
Road and Drainage Services Specialty Trade Contractors
Pyramid Highway/US 395 Connector EIS Study
Due Date: Ongoing
Project Scope • Environmental Impact Statement (EIS) including alternative selection, alignment selection, public outreach, and agency coordination. • Acquire right-of-way sufficient to build the necessary improvements. • Increase the capacity of the intersection to Policy Level of Service (LOS) "E" without degrading LOS at other intersections within the study area below LOS "E" through year 2030