BID #12686
Building Construction Prep and Demo
GRAYTON BEACH DUNE WALKOVER IMPROVEMENT
Due Date: Ongoing
Pre Bid Meeting Date:2013-09-11 00:00:00
Description of Work: Extent of pipes and pipe fittings required by this section is indicated on drawings and/or specified in other sections. Types of pipes and pipe fittings specified in this section include the following: - Ductile - Iron Pressure Pipes (Pressure Pipe) - Plastic Pipes (pressure Pipes) - Miscellaneous Piping Materials/Products