BID #13475
Road and Drainage Services
Glycol Facility Drainage Improvements
Due Date: Ongoing
Restore the Taxiway F slope above the Glycol Recycling Facility, and enhance the storm water gathering and conveyance features to prevent erosion. The project includes: remove concrete and pipe, earthwork, install concrete drainage structures, seeding, mulching, and soil retention blanket. Remove and replace three mechanical storm water diversion gates inside three manholes located in the De-ice Pads A,B, and C.