BID #58101
Water and Sewer 

South 4th Avenue Outfall Replacement

Due Date: Ongoing

The City of Brighton is soliciting bids from licensed and qualified contractors to rehabilitate the south outfall and allow the city to begin using their water supply well. The contractor will be responsible for installing approximately 482 LF of storm sewer pipe with all necessary manholes and 1 flared end section outfall per the design and specifications provided. The construction will include, but will not be limited to the following. 482 linear feet of RCP storm pipe 2 manholes 1 flared end outfall 8400 CY of fill hauled and placed 150 CY of type M riprap Storm sewer pump and materials for install Permitting/inspections Construction as-builts

Original BID Post: Go to Post