BID #57837
Masonry
MISC. ACCESSIBILITY RAMP INSTALLATION PROJECT
Due Date: Ongoing
asphalt concrete sawcutting; concrete saw-cutting; demolition, removal and disposal of existing concrete sidewalk, curbs, gutters, existing base material, and asphalt concrete pavement; removal of existing landscaping and hardscape in the public right-of-way; root pruning; preparation of sub-base and base; installation of accessibility ramps; preparation of sub-base and base and the installation of asphalt concrete pavement; striping; flow-line water testing; providing and maintaining pedestrian access; providing and maintaining traffic control; and all incidentals to complete said work in accordance with these specifications.