RFX #12719
Other Information and Communications
Landside Perimeter Security- Phase 2, Dulles Airport
Due Date: Ongoing
The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to upgrade existing vehicle access control systems at Gates 127, 130 and 317 at Washington Dulles International Airport. Work includes temporary traffic controls, installation of K12 and K4 rated lift arm hydraulic vehicle barriers, integration of the new barriers to the local barrier control and access control systems and reinforcement of fence lines near the gates