BID #12279
Building Construction
Baler Tank Roof Repair
Due Date: Ongoing
Pre Bid Meeting Date:2013-03-14 00:00:00
1. Remove and replace metal roof as needed to install structural bracing to Baler Tank Roof. 2. Fabrication and installation of four sets of 3" STD Steel pipe cross braces to the Baler Tank roof awning over the waste oil tank as per engineering S1.0, S2.0 and S3.0 Appendix "A" 3. Fabricate and install four 2 foot corner braces on four corners to awning